QuikTRAY Installation Instructions Video Transcript
0:01: QuikTRAY Rollout System Installation
0:13: Items needed: 4 pilasters, 2 sets of drawer slides with hook dowels, mounting screws, 2 roll out trays
0:22: Different slides use different hook dowels: Undermount and Ball Bearing
0:25: First attach the hook dowel loosely and then use pilaster to ensure it is at 90 degrees before tightening
0:34: Place a pilaster against the front frame and bottom and screw in place
0:46: Place a second pilaster and hold it in place
0:51: Mount a slide in the bottom holes for both pilasters
0:58: Mount another in the top holes, squaring up both pilasters
1:03: Fasten the second pilaster
1:07: Do the same for the other side
1:12: Once in place, repositioning the slides is easy
1:16: Just lift the edge to tilt the slide and disengage from the pilaster
1:22: At the desired location the slide is again tilted so that the hook dowels can be inserted into the proper holes and pushed in
1:28: Notice how the unique hook dowel design holds the drawer slide in place
1:34: The rollout trays are inserted into the cabinet to complete the installation
1:40: Tray repositioning requires no tools. After the rollout tray has been removed the slides may be easily moved to a new position
1:50: The QuikTRAY Rollout System includes a variety of supports and mounting hardware to fit any standard cabinet or pantry unit.